{"id":4126,"date":"2020-10-27T13:54:03","date_gmt":"2020-10-27T12:54:03","guid":{"rendered":"https:\/\/pq-as-a-service.com\/system-for-power-quality-energy-management-and-pump-automation\/"},"modified":"2021-01-26T15:16:30","modified_gmt":"2021-01-26T14:16:30","slug":"system-for-power-quality-energy-management-and-pump-automation","status":"publish","type":"post","link":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/","title":{"rendered":"System for power quality, energy management and pump automation"},"content":{"rendered":"<h2>Actual situation<\/h2>\n<p>In a large urban city, the technology for supplying fresh water is getting old. Although the pumping stations and the infrastructure are in good condition, the maintenance and repair costs are continuously and extremely increasing. Electrical monitoring of the entire system is only available to a limited extent, and if so, only partially.<!--more--><\/p>\n<h2>Task<\/h2>\n<p>The plant availability and thus the security of supply with fresh water is to be increased to the optimum. Maintenance intervals are to be reduced to a minimum through trend analyses of electrical as well as other physical parameters. In addition, the operator wants to optimise the very high energy demand, as the pumps are controlled (on\/off) rather than regulated. It is also important for the operator to significantly improve the planability and predictability of the entire system.<\/p>\n<h2>Solution<\/h2>\n<p>In order to meet the above requirements, a multi-level system is implemented. This includes a control system application in a main control room, which in turn is split to the individual pump stations. The data is read from the central and subordinate control systems, analysed and measures are derived from it. Measuring devices for recording and evaluating the power quality provide essential measurement data. These have a great influence on the longevity and process reliability of the pumps and system. In addition, electrical as well as other physical parameters are collected at pump level. This means that the maintenance status of the respective pump as well as the system status of the plant are continuously recorded and visualised directly on site as well as in the control systems. In the process, individual power quality parameters are also already collected on a pump basis. It is important to mention that even in the event of a power failure, the measurements are backed up via a UPS (5&#215;3 minutes) to prevent data loss.<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"https:\/\/www.camillebauer.com\/src\/download\/Sicherung_der_elektrischen_Energieversorgung.pdf\">Further information<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Actual situation In a large urban city, the technology for supplying fresh water is getting old. Although the pumping stations and the infrastructure are in good condition, the maintenance and repair costs are continuously and extremely increasing. Electrical monitoring of the entire system is only available to a limited extent, and if so, only partially.<\/p>\n","protected":false},"author":2,"featured_media":2876,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[75,76],"tags":[121,124,123,89,90,82,83,122,87,77,78,79,88,120],"class_list":["post-4126","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-expand-expertise","category-practical-examples","tag-centrax-en","tag-cu3000-en","tag-cu5000-en","tag-demand-side-power-quality-en","tag-dspq-en","tag-en50160-en","tag-ieee519-en","tag-load-management","tag-point-of-common-coupling-en","tag-power-quality","tag-pq3000-en","tag-pq5000-en","tag-pqi-en","tag-web-browser-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>System for power quality, energy management and pump automation - Power Quality Wissen<\/title>\n<meta name=\"description\" content=\"Data and function automation of an urban fresh water supply by means of power quality analysis, data automation and SCADA\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"System for power quality, energy management and pump automation - Power Quality Wissen\" \/>\n<meta property=\"og:description\" content=\"Data and function automation of an urban fresh water supply by means of power quality analysis, data automation and SCADA\" \/>\n<meta property=\"og:url\" content=\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/\" \/>\n<meta property=\"og:site_name\" content=\"Power Quality Wissen\" \/>\n<meta property=\"article:published_time\" content=\"2020-10-27T12:54:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-01-26T14:16:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/i2.wp.com\/pq-as-a-service.com\/wp-content\/uploads\/2020\/10\/Frischwasser.png?fit=785%2C333&ssl=1\" \/>\n\t<meta property=\"og:image:width\" content=\"785\" \/>\n\t<meta property=\"og:image:height\" content=\"333\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Sascha Engel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sascha Engel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/\"},\"author\":{\"name\":\"Sascha Engel\",\"@id\":\"https:\/\/pq-as-a-service.com\/#\/schema\/person\/b447a19e69ea4e5c28fe19b2111853f8\"},\"headline\":\"System for power quality, energy management and pump automation\",\"datePublished\":\"2020-10-27T12:54:03+00:00\",\"dateModified\":\"2021-01-26T14:16:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/\"},\"wordCount\":319,\"commentCount\":0,\"image\":{\"@id\":\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/pq-as-a-service.com\/wp-content\/uploads\/2020\/10\/Frischwasser.png?fit=785%2C333&ssl=1\",\"keywords\":[\"CENTRAX\",\"CU3000\",\"CU5000\",\"Demand Side Power Quality\",\"DSPQ\",\"EN50160\",\"IEEE519\",\"Load management\",\"Point of Common Coupling\",\"Power Quality\",\"PQ3000\",\"PQ5000\",\"PQI\",\"web browser\"],\"articleSection\":[\"Expand expertise\",\"Practical examples\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/\",\"url\":\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/\",\"name\":\"System for power quality, energy management and pump automation - Power Quality Wissen\",\"isPartOf\":{\"@id\":\"https:\/\/pq-as-a-service.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/i0.wp.com\/pq-as-a-service.com\/wp-content\/uploads\/2020\/10\/Frischwasser.png?fit=785%2C333&ssl=1\",\"datePublished\":\"2020-10-27T12:54:03+00:00\",\"dateModified\":\"2021-01-26T14:16:30+00:00\",\"author\":{\"@id\":\"https:\/\/pq-as-a-service.com\/#\/schema\/person\/b447a19e69ea4e5c28fe19b2111853f8\"},\"description\":\"Data and function automation of an urban fresh water supply by means of power quality analysis, data automation and SCADA\",\"breadcrumb\":{\"@id\":\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#primaryimage\",\"url\":\"https:\/\/i0.wp.com\/pq-as-a-service.com\/wp-content\/uploads\/2020\/10\/Frischwasser.png?fit=785%2C333&ssl=1\",\"contentUrl\":\"https:\/\/i0.wp.com\/pq-as-a-service.com\/wp-content\/uploads\/2020\/10\/Frischwasser.png?fit=785%2C333&ssl=1\",\"width\":785,\"height\":333,\"caption\":\"Example of monitoring and control of fresh water in a large city\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\/\/pq-as-a-service.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"System for power quality, energy management and pump automation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/pq-as-a-service.com\/#website\",\"url\":\"https:\/\/pq-as-a-service.com\/\",\"name\":\"Power Quality as a Service\",\"description\":\"Powered by CAMILLE BAUER METRAWATT\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/pq-as-a-service.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/pq-as-a-service.com\/#\/schema\/person\/b447a19e69ea4e5c28fe19b2111853f8\",\"name\":\"Sascha Engel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/pq-as-a-service.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/1bbd2ed3d78858e93cda294b2a96ca362b3eb6495da7fb59a5304ae169f068f9?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/1bbd2ed3d78858e93cda294b2a96ca362b3eb6495da7fb59a5304ae169f068f9?s=96&d=mm&r=g\",\"caption\":\"Sascha Engel\"},\"description\":\"Board Member, CEO\/Managing Director and Author, Camille Bauer Metrawatt AG\",\"sameAs\":[\"http:\/\/www.camillebauer.com\"],\"url\":\"https:\/\/pq-as-a-service.com\/en\/author\/sascha-engel\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"System for power quality, energy management and pump automation - Power Quality Wissen","description":"Data and function automation of an urban fresh water supply by means of power quality analysis, data automation and SCADA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/","og_locale":"en_US","og_type":"article","og_title":"System for power quality, energy management and pump automation - Power Quality Wissen","og_description":"Data and function automation of an urban fresh water supply by means of power quality analysis, data automation and SCADA","og_url":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/","og_site_name":"Power Quality Wissen","article_published_time":"2020-10-27T12:54:03+00:00","article_modified_time":"2021-01-26T14:16:30+00:00","og_image":[{"width":785,"height":333,"url":"https:\/\/i2.wp.com\/pq-as-a-service.com\/wp-content\/uploads\/2020\/10\/Frischwasser.png?fit=785%2C333&ssl=1","type":"image\/png"}],"author":"Sascha Engel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Sascha Engel","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#article","isPartOf":{"@id":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/"},"author":{"name":"Sascha Engel","@id":"https:\/\/pq-as-a-service.com\/#\/schema\/person\/b447a19e69ea4e5c28fe19b2111853f8"},"headline":"System for power quality, energy management and pump automation","datePublished":"2020-10-27T12:54:03+00:00","dateModified":"2021-01-26T14:16:30+00:00","mainEntityOfPage":{"@id":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/"},"wordCount":319,"commentCount":0,"image":{"@id":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/pq-as-a-service.com\/wp-content\/uploads\/2020\/10\/Frischwasser.png?fit=785%2C333&ssl=1","keywords":["CENTRAX","CU3000","CU5000","Demand Side Power Quality","DSPQ","EN50160","IEEE519","Load management","Point of Common Coupling","Power Quality","PQ3000","PQ5000","PQI","web browser"],"articleSection":["Expand expertise","Practical examples"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/","url":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/","name":"System for power quality, energy management and pump automation - Power Quality Wissen","isPartOf":{"@id":"https:\/\/pq-as-a-service.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#primaryimage"},"image":{"@id":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#primaryimage"},"thumbnailUrl":"https:\/\/i0.wp.com\/pq-as-a-service.com\/wp-content\/uploads\/2020\/10\/Frischwasser.png?fit=785%2C333&ssl=1","datePublished":"2020-10-27T12:54:03+00:00","dateModified":"2021-01-26T14:16:30+00:00","author":{"@id":"https:\/\/pq-as-a-service.com\/#\/schema\/person\/b447a19e69ea4e5c28fe19b2111853f8"},"description":"Data and function automation of an urban fresh water supply by means of power quality analysis, data automation and SCADA","breadcrumb":{"@id":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#primaryimage","url":"https:\/\/i0.wp.com\/pq-as-a-service.com\/wp-content\/uploads\/2020\/10\/Frischwasser.png?fit=785%2C333&ssl=1","contentUrl":"https:\/\/i0.wp.com\/pq-as-a-service.com\/wp-content\/uploads\/2020\/10\/Frischwasser.png?fit=785%2C333&ssl=1","width":785,"height":333,"caption":"Example of monitoring and control of fresh water in a large city"},{"@type":"BreadcrumbList","@id":"https:\/\/pq-as-a-service.com\/en\/system-for-power-quality-energy-management-and-pump-automation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/pq-as-a-service.com\/en\/"},{"@type":"ListItem","position":2,"name":"System for power quality, energy management and pump automation"}]},{"@type":"WebSite","@id":"https:\/\/pq-as-a-service.com\/#website","url":"https:\/\/pq-as-a-service.com\/","name":"Power Quality as a Service","description":"Powered by CAMILLE BAUER METRAWATT","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/pq-as-a-service.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/pq-as-a-service.com\/#\/schema\/person\/b447a19e69ea4e5c28fe19b2111853f8","name":"Sascha Engel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/pq-as-a-service.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/1bbd2ed3d78858e93cda294b2a96ca362b3eb6495da7fb59a5304ae169f068f9?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1bbd2ed3d78858e93cda294b2a96ca362b3eb6495da7fb59a5304ae169f068f9?s=96&d=mm&r=g","caption":"Sascha Engel"},"description":"Board Member, CEO\/Managing Director and Author, Camille Bauer Metrawatt AG","sameAs":["http:\/\/www.camillebauer.com"],"url":"https:\/\/pq-as-a-service.com\/en\/author\/sascha-engel\/"}]}},"jetpack_featured_media_url":"https:\/\/i0.wp.com\/pq-as-a-service.com\/wp-content\/uploads\/2020\/10\/Frischwasser.png?fit=785%2C333&ssl=1","jetpack-related-posts":[],"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/pq-as-a-service.com\/en\/wp-json\/wp\/v2\/posts\/4126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pq-as-a-service.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/pq-as-a-service.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/pq-as-a-service.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/pq-as-a-service.com\/en\/wp-json\/wp\/v2\/comments?post=4126"}],"version-history":[{"count":1,"href":"https:\/\/pq-as-a-service.com\/en\/wp-json\/wp\/v2\/posts\/4126\/revisions"}],"predecessor-version":[{"id":4127,"href":"https:\/\/pq-as-a-service.com\/en\/wp-json\/wp\/v2\/posts\/4126\/revisions\/4127"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pq-as-a-service.com\/en\/wp-json\/wp\/v2\/media\/2876"}],"wp:attachment":[{"href":"https:\/\/pq-as-a-service.com\/en\/wp-json\/wp\/v2\/media?parent=4126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/pq-as-a-service.com\/en\/wp-json\/wp\/v2\/categories?post=4126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/pq-as-a-service.com\/en\/wp-json\/wp\/v2\/tags?post=4126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}